To log repair labor in PracticePanther, create each time entry and set its hourly rate to $0.00. A vendor visit, a replaced faucet, a call to a contractor about a leak: each one uses hours that someone should record. The hard part is recording those hours in PracticePanther without attaching a billing rate to work your team never meant to charge out.
Key takeaways
- Create each time entry and set its hourly rate to $0.00.
- Check that the saved entry shows a rate of $0.00.
- Write a note that names the property, the repair, and the source of the work.
- Review and correct entries in bulk, then compare them across users and matters.
This post gives you a simple method in three steps. First, create the time entry and set its rate. Second, write notes that make each repair easy to find later. Third, review and edit entries in bulk when something needs fixing. Each step is based on PracticePanther's help article on time entries, which covers the time entry features described here.
One scope note first. This post explains how to record repair labor in PracticePanther. It does not decide whether your organization should bill that labor, and it does not cover accounting or tax treatment. Those decisions belong to your management and your accountant. Once you know the policy, the steps below help your entries match it.
Related guides: Tenant repair complaint log: 7 fields to record · Eviction delays: 3 clocks that can add time to a case.
Settle these questions before you start
Before anyone logs a repair hour, get clear answers to a few questions. The steps in this post work the same way whatever the answers are, but your log will be far more useful if the team has agreed on them. Write the answers down where the staff can see them.
- Which kinds of work count as repair work for logging purposes?
- Who is allowed to log repair hours, and whose hours are they?
- Which matter should a repair entry be logged against, and who chooses it?
- How should notes be written, and does anyone check them?
- Who decides whether a repair is billed, and how will that decision reach the log?
Those answers are yours to set. This post will not make them for you, and no product setting can replace a clear agreement between the people doing the work and the people reviewing it. Who assigns the work is covered in Rental repair planning: 6 steps before assigning work.
Why a $0.00 rate fits repair labor
The product lets you set an hourly rate for yourself as well as for all other users, create time entries, track time from any device, generate invoices, and compare time entries across users and matters ( source). Those features are useful, but a rate is not always the right thing to attach to repair hours.
A $0.00 hourly rate on a time entry gives you a record of the hours without assigning them a rate. The entry can still be compared with other entries across users and matters. That gives reviewers what they need to see how much staff time went into repairs, without turning those hours into a charge.
It also helps to be clear about what the rate field is doing. It sets the value of that one entry, and nothing more. It does not change the work that was done. Keeping that distinction clear makes the rest of the method easier to explain to a colleague.
Step 1: Create the time entry and set the rate to $0.00
The core rule is short. When you create a time entry, change the hourly rate to $0.00 ( source). The rest of this method depends on it. Make the change at creation, when the details are fresh, rather than trying to remember it later.
Here is the sequence I would follow for a new repair entry:
- Click Time Entries in the top navigation bar, then start a new entry ( source).
- Enter the matter the repair belongs to, the date, and the hours the staff member actually worked.
- Change the Hourly Rate field to $0.00.
- Add notes that describe the repair, as covered in step two below.
- Save the entry, then check that the rate on the saved entry reads $0.00.
Check the rate every time. It is easy to skip the field when you are moving quickly through a batch of repairs, and an entry that keeps a normal rate by accident is the kind of error that is hard to spot later.
Step 2: Write notes that make each repair easy to find
A $0.00 entry with a vague description causes problems later. Six months from now, someone reviewing hours will need to know which property, which repair, and which kind of work the entry covers. A good note answers those questions in one line.
If you track time with a timer instead of typing hours after the fact, notes matter even more. The help article explains that when you add notes to a timer, those notes appear as the description on the time entry ( source). So the words you type while the timer runs become the words the log shows later. Use that to your advantage.
Write each note as if it will be read by someone who was not there. A workable pattern is the property or unit, the repair, and the source of the work. For example: "Unit 4B, replaced bathroom exhaust fan, work order from tenant call." Keep the words plain and specific. Avoid shorthand that only you understand, such as initials or internal codes.
When you run more than one timer on a job, pay attention to order. The help article notes that the second timer will appear above the first timer ( source). Read the list before you save so the sequence of work makes sense to the next reviewer. If the first timer covered the diagnosis and the second covered the fix, the notes should say so, in order.
Step 3: Review and edit entries in bulk
Mistakes happen. A coordinator might forget the rate on a batch of entries, or pick the wrong matter for one of them. The help article on time entries walks through editing existing entries, and it covers selecting more than one entry at a time.
In practice, a bulk fix looks like this:
- Select the time entries you want to edit, picking only the repair entries rather than the whole list ( source).
- Toggle the buttons for the items you want to change to "Yes." Only switch on the fields that need correcting ( source).
- Make the correction to each entry individually, then review before saving.
Review the selection before you save. A list that looks right on screen can still include one unrelated entry, and that one is easy to miss.
Illustrative example: one faucet repair
A tenant reports a dripping bathroom faucet in Unit 4B. A coordinator spends time on the phone arranging a plumber, then walks the unit with the plumber.
The coordinator starts a timer for the call and types the note "Unit 4B, bathroom faucet drip, arranging plumber." That note becomes the description on the entry. A second timer runs during the walk-through with the note "Unit 4B, faucet inspection with plumber." Because the second timer appears above the first, the coordinator checks that order before saving.
Next, the coordinator sets each entry's hourly rate to $0.00 and saves. Later, a comparison across matters confirms that Unit 4B's repair hours sit under the right matter.
Suppose the owner later decides the repair should be billed. The coordinator selects those entries, toggles the relevant items to "Yes", and changes the rate on each entry individually, as step one describes.
Check your work across users and matters
Once the entries are clean, compare them. The product can compare time entries across users and matters, which is useful here ( source). You can look at how repair hours are spread across staff members, and across properties if each property is set up as a matter. That view shows whether one technician is carrying most of the load or whether a property is absorbing hours out of proportion to its size.
Use the comparison as a monthly habit, not a one-time check. A short review at the end of each month catches missing notes, wrong matters, and forgotten rates while the details are still fresh.
Keep your own rate separate from repair entries
Staff members can have their own hourly rates. In your settings menu, find the hourly rate box and simply enter your going rate ( source). The product lets you set a rate for yourself as well as for all other users, so think of a settings rate and an entry rate as two different settings.
Leave your settings rate alone and change the rate on each repair entry instead.
Common mistakes and how to avoid them
Repair hours tend to go wrong in a few predictable ways. The list below covers the errors that are easy to make and hard to spot later.
Forgetting the rate. An entry created without changing the rate is easy to leave at its normal rate. Fix it at creation, and check the saved entry as described in step one.
Editing the settings instead of the entry. Your settings rate is your own going rate. Change the rate on each repair entry instead.
Vague notes. "Repair" or "fixed stuff" tells a reviewer nothing. Use the property, the repair, and the source of the work.
Timers left running. A timer that keeps going after the job ends adds time nobody spent on the repair. Stop each timer when the task ends, and check the entry before you save.
Logging after the fact from memory. Hours written down days later tend to be rounded and vague. Log while the details are fresh, or use a timer during the work. For how rounding methods differ, see Repair labor hours: 3 rounding methods for billing.
Wrong matter. A repair logged to the wrong property is hard to find again. Use the comparison across matters to spot entries that look out of place.
Duplicate entries. Logging the same visit twice, once by timer and once by hand, doubles the hours on paper. Search for the job before you add a new entry.
Train new staff with one real entry
New staff members learn this method faster from a real entry than from a list. Pick a recent repair that already has a clean log, and walk the new person through it: where to click, where the rate lives, what the note should say, and how to check the result. Then have them create their next entry while you watch, and check it together.
Keep the first week gentle. Expect some entries to need a correction, and treat those corrections as normal practice rather than failure. The goal is a log that a stranger could read and understand, and that takes repetition to build.
Set up a routine your team can follow
A method only works if the people using it know it. Write the three steps on one page, keep it where staff log time, and walk through it with anyone who records repair hours. A short walkthrough with a real entry on screen teaches more than a long memo.
Decide who owns the review. One workable split: the maintenance coordinator logs hours for the field crew, and a property manager checks the log. Whoever owns the review should have a fixed time to do it, such as the same day each week, so entries do not pile up. Those roles are a suggestion for your team to adapt, not a rule.
Pick a regular point in the week for the check. Entries written at the end of a long day can be thinner than entries written as the work happens, so a regular check catches gaps early.
Reading the log as a reviewer
If you review repair hours, you read the log for different things than the person who wrote it. You are looking for gaps and outliers, not re-checking work you already know about. A simple reading order helps.
- Look at one matter or one property at a time, so the log reads as one story.
- Read the notes first. A note that does not match the matter is the fastest sign of a logging error.
- Check each $0.00 entry for a repair note. A zero rate with no clear description is the entry most likely to need a question.
- Compare hours across staff members, and ask about any single person whose totals look far out of line with the rest of the team.
Write your questions down as you go and send them to the person who made the entry, rather than fixing their work silently. A question keeps the record honest, and it helps the next entry come out clearer.
When the policy changes
Sometimes a decision about repair work changes after the entries are already in. The good news is that existing entries can be edited, and the bulk editing steps above apply to them too. Find the affected entries, select them, and make the change the new policy calls for. Then check a sample of the results against your records.
Keep a note of what you changed and why. A one-line record, kept with the job or the month's review, saves a lot of questions later. It does not need to be elaborate.
One step to take today
Open Time Entries and find your most recent repair entry. If its hourly rate is not $0.00, edit it, then check that its note names the property, the repair, and the source of the work.
Questions readers ask
Does a $0.00 rate mean the work was free? No, a $0.00 rate means the entry carries no rate, not that the work was free. The work still happened, the hours are still on the record, and the entry can still be compared across users and matters. Whether the work is charged to anyone is a separate decision.
Can I just change my settings rate to $0.00 and leave the entries alone? No. Change each repair entry instead, because the entry is where this method works.
Should I log the time of a vendor? That is a team decision this post does not cover, so settle it before anyone starts a timer for a vendor visit.
What if I forget to log a repair until the following week? Log it as soon as you remember, and say in the note that it was entered late. A reviewer who sees a late entry with a clear note can judge it fairly, while an unexplained one invites questions.