Washington, Delaware and Wisconsin have six repair and tenant notice deadlines tied to lock changes, bed bug reports and promised repairs.
Key takeaways
- Record the event that starts each clock before calculating a deadline.
- Check required documents and delivery methods when a notice arrives.
- Assign someone to track each open repair or notice.
- Keep proof of notices and completed work with the relevant dates.
Why these deadlines matter
Rental work runs on dates. A leak gets reported on a Friday, a tenant mails a notice on a Tuesday, a pest company finds something on a Thursday, and somewhere in that chain someone has to count days. Miss one count and a routine repair can turn into a dispute. A tenant who sees a missed date may also read it as a broken promise.
Some of these clocks start with a tenant's action and others start with yours. That difference shapes what you can control. You cannot make a tenant deliver a notice on time, but you can make sure your calendar is ready when the date arrives.
The dates also matter to the people who handle the books. The dates in a file are often the evidence if a question comes up months later. A bookkeeper who can see when a notice arrived, how it was delivered and when a repair was promised can answer in minutes what would otherwise take a long search.
Two of the six come from Washington's rule on lock changes, three from Delaware's bed bug rules, and one from a Wisconsin rule on promised repairs.
The sections below take each state in turn. Some of these rules bind tenants and others bind landlords, so staff should understand both sides.
Washington: the two lock-change clocks
Washington's rule on changing locks is in RCW 59.18.575. It sets two time frames, and both can show up in a property file.
The first clock starts when a lock is changed or added. Within seven days, the statute says, the tenant must deliver to the landlord, by mail, fax, or personal delivery by a third party, two things: written notice that the tenant has changed or added locks, and a copy of a valid order for protection or a written record of a report signed by a qualified third party. Those documents are the substance of the first clock, so a notice without them is incomplete even if it arrives on time.
The delivery method matters as much as the deadline. Flag it for review the day it comes in, along with any missing item.
The second clock starts from the lock notice itself. Within sixty days after that notice is provided, the statute says, the tenant must notify the landlord in writing that the tenant does not wish to terminate the rental agreement. If no such statement arrives, record that fact for review.
The two clocks start from different events, a lock change for the first and the notice itself for the second, so their dates can drift apart. Here is a simple way to handle both:
- Count from the day the lock notice was provided, not the day the envelope was opened.
- Mark the sixtieth day after that date.
- Set a reminder a few days before the sixtieth day to see whether the tenant's written statement has arrived.
Pin down that start date before anything else, because every later date depends on it.
Delaware: bed bug deadlines
Delaware's bed bug duties for landlords appear in Chapter 53 of Title 25 of the Delaware Code, which you can read at delcode.delaware.gov. The chapter lists several steps a landlord must take after a bed bug complaint. Three of them carry time limits. Two more involve notices or records. Together they make a usable checklist for anyone who handles bed bug reports.
The steps overlap in practice. A complaint can trigger the neighbor review, a determination can trigger remedial scheduling, and the pest professional's information starts the 120-hour clock for tenant notice. Seeing them as one sequence keeps a deadline from slipping because attention moved to the next step.
Five days for the units next to the reported unit
The code sets a duty for every unit directly adjacent to, above or below the dwelling unit or common area from which the original report came. Within 5 days of notification, that unit must be inspected, or investigatory services must be obtained for it through a pest management professional.
The rule reaches past the unit that was reported, and it applies the same way when the report came from a common area. Build the list of neighboring units as soon as a complaint comes in. A floor plan with those units marked lets a maintenance tech or an office assistant see the whole set at a glance. Record when notification occurred rather than assuming a later review date starts the clock.
Fourteen days for remedial services
Once an infestation is determined, the code requires the landlord to obtain remedial services from a pest management professional and provide them, and to do so within 14 days of notification. This is a separate clock from the five-day inspection step. Like that one, it runs from notification rather than from the day someone first noticed the problem. The determination is the trigger, so the day a pest professional reports an infestation is the day to look at first.
Three dates decide whether this window was met: the date of notification, the date remedial services were obtained, and the date they were provided. Comparing the first with the last shows whether the window was met. If treatment runs over several visits, the timeline depends on when the work actually happened.
Scheduling is the other half of this step. The remedial work depends on the pest professional's calendar, so request a visit date as soon as the determination is made.
Notice before entering a unit
The code requires the landlord to give tenants notice under § 5509 of Title 25 before entering a dwelling unit for inspection, bed bug remediation or monitoring tied to a bed bug complaint. Check § 5509 directly for the timing before arranging entry.
Plan the notice and visit together so the notice goes out before entry. A standard notice form keeps the wording consistent from one visit to the next. If an entry covers monitoring as well as remediation, say so in the notice, so the stated purpose matches what happens during the visit.
120 hours to tell tenants of the determination
The code says the landlord must give all tenants of affected units notice of the pest management professional's determination within 120 hours of receiving the information from that professional. Record the time the information arrived, not only the day.
Because the clock is in hours, a delay that looks short on a calendar can still miss the window. Keep each affected unit's household list current before a determination arrives, since a missing name can leave a tenant without a notice the rule requires. For related steps, see the guide to handling a tenant's bed bug report.
Keeping records
The code also requires the landlord to maintain a written record of all complaints and control measures provided. The record must include reports of chemicals applied and other remedies provided by the pest management professional or other person, along with any other reports or billing records the pest professional prepared. Keep those records with the dates and notices for the same complaint.
Wisconsin: a promised date is a deadline
Wisconsin's rule on promised repairs is in the state administrative code at ATCP 134.09. Unlike the Washington and Delaware rules above, this one does not set a number of days. It creates a different kind of deadline: the date you write yourself.
The rule says that every promise or representation a landlord makes to a tenant or prospective tenant that the dwelling unit or any other portion of the premises, including furnishings or facilities, will be cleaned, repaired or otherwise improved must specify the date or time period on or within which the work is to be completed. That covers promises made at a showing, in a text message, in an email, or on a phone call with a tenant. Many landlords treat such remarks as casual. The rule treats them as statements that carry a date, so a text message can matter as much as a formal document.
The rule goes on to say that no landlord shall fail to complete the promised cleaning, repairs or improvements on the date or within the time period represented. If you tell a tenant the furnace will be fixed by a certain day, that day is when the work must be done.
What to do when the work will run late
The rule also covers delays. The landlord must give the tenant timely notice of reasons beyond the landlord's control for any delay in performance, stating when the cleaning, repairs or improvements will be completed. Check that the notice includes both parts before sending it.
Set an internal standard for handling delays and apply it every time. Sending the delay notice as soon as you learn the work will slip, rather than on the day it was due, is a sound standard to start with. A delay notice also serves both sides. It tells the tenant what changed, and it creates a dated record of your response.
Making the promise easy to check
A vague promise is hard to check later. "We'll try to get to it soon" gives no committed completion date or window. A workable promise names the item, the work and the date or window. Compare "the bathroom fan will be replaced before the end of the month" with that loose assurance. Only the first gives the rule something to measure.
Train staff to state a specific completion date, or a specific window, every time they make a repair promise. If the work is likely to take more than one visit, put the expected completion date in the promise itself; if it changes, follow the delay-notice steps above.
Maintenance, office and management staff should all work from the same promised date. A tech who gives one date and an office that gives another leaves the tenant with two answers, and the rule measures the work against whatever was represented.
Turning these deadlines into a tracker
Six deadlines are easy to remember. The trouble comes when many units, three states and several tenants each have their own dates. A simple tracker helps keep those dates together.
Set up one row for each event. Useful columns include the property and unit, the tenants involved, the event type, the date the event happened, the date the notice was provided or received, the delivery method, the deadline, the person responsible, the date the step was completed and a link to the proof. Record every date you rely on and attach the proof to its row, so a question months later can be answered from one place.
The tracker does not need special software. A shared spreadsheet works if everyone uses it the same way. Use color or flags for deadlines that are close, and review open items at a set time each week. The point is that someone looks at the list every day, not that the list looks fancy.
Use a record row like this to connect an event with its supporting file:
| Record | Event | Supporting file |
|---|---|---|
| Example | Repair promise | Written promise and completion record |
Make sure the bookkeeper can open the tracker too. When a question about a notice or a repair comes up, the answer should sit in one file, not spread across inboxes, texts and paper folders.
Illustrative example: recording a repair promise
For illustration, a repair promise gives a completion window of 10 days. Staff record the promise, assign the work and save the completion record when the repair is finished after 7 days. Comparing the promised window with the completion record makes the result easy to check later. These are illustrative timing choices, not a statutory day count.
What this post does not cover
This post is general information, not legal advice. It draws on official sources, and those sources can change. Before you rely on a deadline, read the full text at the linked page and confirm that the version you are reading is current. If a situation involves a lease dispute, an eviction, a court order, or a question about what a specific statute requires, talk to a qualified attorney in the state where the property is located.
The post also does not cover every repair rule in these states. It covers only the parts of each rule that bear on repairs and tenant notices. Other rules about habitability, security deposits, notices to end a tenancy and rent may apply and may carry their own deadlines. Use this post as a starting point for the dates it covers, and treat the rest as a separate project.
Finally, these rules set time limits or required steps, and the Wisconsin rule works through dates you write yourself. They do not tell you how to run your business. A strong practice is to finish early and have proof ready before anyone asks. The six deadlines above are a good place to start.
Today, choose an open repair or notice and check its starting event, deadline, assigned staff member and supporting file in your tracker.
Related guides: Rental repair requirements: 5 state provisions to check · Repair complaint retaliation: 4 state rules to check · Adverse action notice after rental denial: 5 parts.
Questions about repair and notice deadlines
Can staff use a shared spreadsheet?
Yes, a shared spreadsheet can hold the dates and proof for each event. Give maintenance, office and bookkeeping staff access to the same record.
What should staff check before relying on a deadline?
Read the current linked rule and confirm which event starts the clock. Keep that event's supporting document with the calculated deadline.